The Problem
A new production line required a GMP-compliant cleanroom with validated filtration and pressure control.
Engineering Challenge
Meeting cleanroom classification and full validation within a fixed project timeline.
Installed Products
HEPA/ULPA filtration, AHU with pressure cascade, ventilation, validation
Implementation Process
Design to classification, supply and install, particle-count testing, validation and documentation, AMC.
Before & After
Before
Uncontrolled environment; no classification
After
Certified cleanroom class with validated performance